A Look at the Process of Building Demolition

The building demolition process relies on a series of complex and carefully coordinated procedures in order to safely remove all remnants of a building. In order to successfully perform a building demolition, a contractor must use the correct tools and equipment . By choosing the proper equipment for the demolition process, a contractor can ensure that the job is completed to the highest safety standards. Let’s take a look inside how the building demolition process works.

Building Demolition - A Tool Shed

Drill Dynamite Holes

The first step of building demolition is to locate and drill all of the holes that will be used during the procedure. In order to demolish a building, a contractor must carefully place dynamite throughout the structure. Typically, the dynamite is placed in a vertical pattern along the support structures of the building. By placing dynamite in the correct areas, the contractor can make sure that the demolition goes smoothly.

Insert and Cap Dynamite

The next step of building demolition is to insert and cap all of the dynamite that will be used during the process. Each drilled hole contains enough space for a stick of dynamite and its cap. Each stick of dynamite is linked to a single detonator cable, which is responsible for initiating the blast.

Detonate the Dynamite

Once the dynamite and detonator cable have been safely secured, it will be time to demolish the building. A person known as a blaster will take the steps needed to detonate the cable. As the cable detonates the dynamite, the building will collapse in a series of timed explosions.

If you are in need of equipment for a demolition project, be sure to contact A Tool Shed . Our tool rental and equipment rental company provides six locations in Northern California with a terrific range of supplies and services for a variety of tasks. To learn more about how we can assist you with your next building demolition, give us a call at (831) 359-4769.